The Lang Walker AO Medical Research Building will form part of a new research and medical precinct in the Campbelltown Hospital redevelopment, delivering world-class research and healthcare for the Macarthur region and wider Western Sydney community. Opening in 2025, the five-storey facility will provide the infrastructure needed for greater scientific, clinical and industry collaboration, positioning the region as a leading healthcare destination in NSW.
ROLE:
HVAC BIM ENGINEER
DUTIES:
• Developing BIM models from 2D HVAC sketches using Revit.
• Performing model coordination with other contractors.
• Run Clash-Detection, produce, issue tracking logs and follow-up to ensure
resolution of conflicts using Navisworks.
• Liaising with consultants & contractors for any model amendments.
• Documenting and extracting well-detailed shop drawings for HVAC
manufacturing and installation process.
• Extracted schedules & Quantity take-off from the model for HVAC components.